A full‑scene electric mining truck—“Super Power Bank”—with Ruisu’s 3 MW ultra‑fast charging, capable of a full charge in as little as one hour!



Click the blue font above to follow us.

In open-pit mining and large-scale infrastructure projects, electric haul trucks have long faced operational pain points: slow charging, difficult compatibility, and poor resilience to harsh environments. With battery capacities often ranging from 600 to 1,000 kWh, conventional charging equipment can take 3–4 hours to recharge, directly delaying project schedules. Moreover, the mixed use of multi-brand haul trucks exacerbates compatibility issues—“this charger won’t work with that vehicle.” And in the frigid winters of northern regions, combined with pervasive mine dust, standard charging systems frequently break down.

Now, these challenges have been addressed with targeted solutions: Ruisu Intelligent Technology’s 3 MW flash‑charging system is specially designed for electric mining trucks. Not only does it fully兼容 with mainstream models on the market, but its ultra‑fast charging, exceptional weather resistance, and fully automated operation make it a “super power bank” for construction sites!

01

Fully compatible! Supports mainstream electric mining trucks from Zoomlion, SANY, XCMG, and more—capable of charging even at high power consumption.

In construction‑site applications, electric mining trucks often vary in brand and battery capacity. However, the Ruisu 3 MW flash‑charging system, with its 1500 V DC high‑voltage output and 2000 A high‑current design, seamlessly accommodates all mainstream models, eliminating concerns about compatibility barriers.

1

Compatible with Zoomlion ZE35E electric mining truck (battery capacity approximately 500 kWh)

• Full battery recharge in under 1 hour, meeting the daily transportation needs of a mine;

2

Compatible with SANY Heavy Industry SYE360 electric mining truck (battery capacity approximately 600 kWh)

• Leveraging a 3 MW single-gun rated power, it can charge from 30% to full in under one hour—more than three times faster than conventional equipment.

3

Compatible with the XCMG XE380E electric mining truck (battery capacity approximately 550 kWh)

• Constant‑power voltage range: 300–1500 VDC, with stable output across the entire range, eliminating the “slow‑charge drag” that occurs in the later stages of charging.

The following To ensure compatibility between select brands of electric mining trucks and the Ruisu megawatt‑class flash‑charging system, great products speak for themselves—just let the data do the talking!

Whether it’s a medium‑ or small‑sized mining truck with a 500 kWh battery, or a large‑size model exceeding 600 kWh, the system can precisely match charging requirements, truly enabling “one device to meet the energy‑replenishment needs of all electric mining trucks across construction projects.”

02

6 Major Core Advantages! Tackling the Pain Points of Charging Mining Trucks in Construction Projects

For construction‑industry clients, “easy to use, durable, cost‑effective, and safe” are the bottom line. The Ruisu 3 MW flash‑charging system is designed with real‑world application needs in mind, delivering six core competitive advantages:

Ultra-fast charging: Project progress never “loses power”

• With a single gun rated at 3 MW, this system can fully charge a high-capacity mining truck like SANY’s SYE360—boasting a 600 kWh battery—in just one hour. Assuming a mine operates 10 electric mining trucks, the entire fleet could be charged in only two hours per day, cutting charging time by 75% compared to conventional equipment and extending daily operating hours by 2–3 hours.

Withstands Extreme Conditions: Unfazed by Northern Frigidity and Mine Dust

• Construction projects often operate in extreme environments: frigid winter temperatures as low as –20°C in northern regions, significant diurnal temperature swings in mining areas, and pervasive dust. The system features built-in anti‑condensation and freeze‑protection functions, with an IP54 protection rating, ensuring stable operation even under snow cover or heavy dust accumulation—eliminating the hassle of shutdowns due to adverse weather conditions.

Fully automatic charging: saves labor and ensures safety.

• Mines and infrastructure construction sites are often located in remote areas, where manual on-site monitoring is costly and poses safety risks. The system is equipped with a fully automated robotic arm that can autonomously perform the entire process—plugging in the charging gun, initiating charging, and unplugging it—without any human intervention. During charging, the gun connector locks automatically and unlocks upon completion of the transaction, thereby preventing potential safety hazards caused by operator error.

High cost-effectiveness: saves money over the long term.

Effectiveness High rate Peak efficiency reaches 96%, standby power consumption is low, and charging losses per kilowatt-hour are 30% lower than the industry average.

Distribution Province : Rated power factor of 0.99, harmonic distortion below 5%; no additional compensation equipment is required on the distribution side, resulting in a 15%–20% reduction in initial investment.

Measurement accuracy : DC metering is CMC‑certified, with Class 1 accuracy, supporting peak‑valley billing for more precise cost management.

Multi-layered safety protection: Ensuring the safety of both people and vehicles throughout the journey.

• During charging, the system performs real-time monitoring of AC-side leakage protection, DC-side insulation detection, and temperature and oil‑temperature sensing at the charging gun connector; any detected anomaly triggers immediate termination of the charging process. Meanwhile, via 4G or Ethernet, the system maintains real-time communication with the monitoring center, enabling remote throttling of the on-board charger’s output power to ensure comprehensive safety.

Flexible Networking: Smarter Management

• Supports 4G or Ethernet connectivity, enabling access to the Ruisu backend and the Yun Kuai Chong platform, while also being compatible with Party A’s proprietary management system. This allows the engineering team to monitor, in real time from the office, each mining card’s charging progress, energy consumption, and associated costs, achieving “remote monitoring and intelligent management.”

03

Customer Case Study: Hunan Xiangdian Group’s “Energy-Replenishment Revolution” in Open-Pit Mines

Following the deployment of one Ruisu intelligent fully automated robotic plug‑in/removal 3 MW flash‑charging system at an open-pit mine in Hulunbuir, Inner Mongolia, Hunan Xiangdian Group has achieved three major transformations.

1. Electric mining truck The average daily charging time has been reduced from 4 hours to 1 hour, and the average daily transport volume has increased by 15%.

2. Fully automated charging requires no manual supervision, saving approximately RMB 20,000 in labor costs per month.

3. Winter – Under low-temperature conditions of 25°C, the equipment operated without any malfunctions, and no project delays were caused by charging issues.

04

Scan the code for a consultation and receive your customized electric mining truck charging solution for construction projects.

If you’re struggling with slow charging, difficult compatibility, and harsh environmental conditions for your electric mining trucks, simply scan the “Official Customer Service QR Code” below. Ruisu Intelligent Technology will tailor a customized charging solution based on your mine’s scale, the number of mining trucks, and local environmental factors.

Company website: www.gzruisu.com

Company Name: Guangzhou Ruisu Intelligent Technology Co., Ltd.

Company Service Hotline: 020-66260688 / 133-3288-5836

Company Address: No. 160, Tashan Avenue, Zengjiang Street, Zengcheng District, Guangzhou, Guangdong Province